Site S19

From Beaver Run Project
Jump to: navigation, search

This is a summary report of all data for Mamont 1 Pad site 19.

See Interpreting field and lab reports for more detailed information about the data in these tables.

Field Data Summary

Below is a field data summary report for this site, including averages and standard deviations of all measureable parameters. Collector initials are explained here.

Date Collector(s) Time pH TDS (ppm) Cond.(μS) Temp.(°C) Comments
2014/03 (Q12) TH, BO, ET, DT 12:52 6.72 48 101 3.0 new point
2014/06 (Q13) TH, DT, JV, MP 16:19 7.16 79 157 20.1 moderate flow
2014/09 (Q14) BO, ET, IT, BF 9:00 8.04 113 226 14.6 very low flow, water pooled below culvert
2014/12 (Q15) BO, TH 13:09 7.79 46 91 7.9 high flow
2015/03 (Q16) BO, BF 23:47 7.54 48 96 3.6 high flow
2015/06 (Q17) BO, GM, SW 12:33 7.74 53 108 17.3 high flow out of culvert
2015/09 (Q18) BO, NH, SJ 12:21 7.92 98 196 20.9 low flow
2015/12 (Q19) BO, PM 13:54 7.18 64 128 10.0 moderate flow
2016/03 (Q20) BO, KL, JC 10:29 6.64 67 134 5.4 moderate flow
2016/06 (Q21) BO, GO, MH 10:12 7.64 94 183 19.3 moderate-low flow
2016/09 (Q22) BO, CW, MH, SJ 15:25 7.54 117 235 21.8 low flow
2016/12 (Q23) BO, MH, GO 12:07 6.41 34 68 5.6 very high flow
2017/03 (Q24) BO, ST, SS 10:18 7.58 54 107 8.0 moderately high flow
2017/06 (Q25) BO, AL 10:27 7.00 36 75 17.5 very high flow
2017/09 (Q26) BO, DM, EP, EG, SS 15:06 5.98 106 215 19.7 still, shallow
2017/12 (Q27) BO, SS, ZH 10:29 8.17 72 142 2.5 medium flow
2018/03 (Q28) BO, DM, EP, SS 10:21 8.60 62 123 1.2 medium-high flow
Averages: 7.39 70 140 11.7
Standard Deviations: 0.68 27 53 7.5

Notes