This is a summary report of all data for Mamont 1 Pad site 05.

See Interpreting field and lab reports for more detailed information about the data in these tables.

Field Data Summary

Below is a field data summary report for this site, including averages and standard deviations of all measureable parameters. Collector initials are explained here.

Date Collector(s) Time pH TDS (ppm) Cond.(μS) Temp.(°C) Comments
2012/03 (Q04) RC, AH 12:20 7.52 39 80 6.5 low flow
2012/06 (Q05) BF, AH dry[1]
2012/09 (Q06) BF, AH 11:55 dry
2012/12 (Q07) BF, SD 11:56 8.29 36 73 8.8 low flow
2013/03 (Q08) DT, AH 11:20 6.88 41 80 5.1 low flow
2013/06 (Q09) DT, JV dry
2013/09 (Q10) ASo, DT, JV dry
2013/12 (Q11) SD, BF 11:05 7.55 90 180 8.4 high flow
2014/03 (Q12) TH, BO, ET, DT 12:32 7.58 116 232 4.6 none
2014/06 (Q13) TH, DT, JV, MP 17:07 dry
2014/09 (Q14) BO, ET, IT, BF 11:30 dry
2014/12 (Q15) BO, TH 12:45 7.26 74 151 8.8 low and clear
2015/03 (Q16) BO, BF 13:25 7.28 95 190 5.8 low flow
2015/06 (Q17) BO, GM, SW 14:17 7.28 113 226 15.9 relatively high flow
2015/09 (Q18) BO, NH, SJ 11:40 dry
2015/12 (Q19) BO, PM 13:32 dry
2016/03 (Q20) BO, KL, JC 12:19 dry
2016/06 (Q21) BO, GO, MH 11:59 dry
2016/09 (Q22) BO, CW, MH, SJ dropped[2]
Averages: 7.46 76 152 8.0
Standard Deviations: 0.41 33 66 3.6

Notes

  1. ^ A site denoted as "dry" indicates an active sampling site that has little or no water present for field measurements.
  2. ^ A site denoted by "dropped" means that this sampling point will no longer be visited for field or lab data collection. Reasons for dropping a sampling point may include: redundancy with other sites; site is no longer accessible; land use changes may have removed the site (e.g., new road, culvert, etc.). This site will not appear in future data reports unless reactivated.