Site S02

From Beaver Run Project
Jump to: navigation, search

This is a summary report of all data for Mamont 1 Pad site 02.

See Interpreting field and lab reports for more detailed information about the data in these tables.

Field Data Summary

Below is a field data summary report for this site, including averages and standard deviations of all measureable parameters. Collector initials are explained here.

Date Collector(s) Time pH TDS (ppm) Cond.(μS) Temp.(°C) Comments
2012/03 (Q04) RC, AH 12:00 8.16 104 213 7.1 edge of reservior, no flow
2012/06 (Q05) BF, AH 11:00 7.85 165 330 10.9 culvert drainage
2012/09 (Q06) BF, AH 11:15 7.43 197 395 21.3 low flow
2012/12 (Q07) BF, SD 11:20 8.67 78 154 6.0 high flow
2013/03 (Q08) DT, AH 10:15 7.33 149 289 3.1 moderate flow
2013/06 (Q09) DT, JV 10:05 8.00 170 340 17.2 moderate flow
2013/09 (Q10) ASo, DT, JV 17:04 7.93 139 278 17.3 moderate flow
2013/12 (Q11) SD, BF 10:16 7.53 170 336 7.5 high water level
2014/03 (Q12) TH, BO, ET, DT 12:00 7.04 138 275 3.7 moderate flow
2014/06 (Q13) TH, DT, JV, MP 17:15 7.20 164 333 22.3 moderate flow
2014/09 (Q14) BO, ET, IT, BF 9:59 8.17 224 447 14.1 moderate flow
2014/12 (Q15) BO, TH 11:45 7.75 85 169 6.5 very high flow out of culvert, muddy
2015/03 (Q16) BO, BF 12:28 7.22 148 298 4.8 reservoir backed up to culvert, measured above
2015/06 (Q17) BO, GM, SW 13:16 7.40 90 187 17.8 sampled upstream side of culvert, reservoir backed up
2015/09 (Q18) BO, NH, SJ 10:44 7.95 226 452 18.6 low flow
2015/12 (Q19) BO, PM 12:34 7.69 131 261 9.0 moderate-high flow
2016/03 (Q20) BO, KL, JC 11:20 7.59 150 300 5.8 high flow
2016/06 (Q21) BO, GO, MH 10:58 7.85 207 413 20.4 low flow
2016/09 (Q22) BO, CW, MH, SJ 16:06 7.59 222 449 22.9 low flow
2016/12 (Q23) BO, MH, GO 10:40 6.30 80 160 5.2 extremely high flow
2017/03 (Q24) BO, ST, SS 11:00 7.66 145 295 10.2 high flow
2017/06 (Q25) BO, AL 11:09 7.23 135 275 24.4 reservoir backed up to culvert
2017/09 (Q26) BO, DM, EP, EG, SS 15:44 7.02 239 480 20.0 low flow
2017/12 (Q27) BO, SS, ZH 10:59 6.89 130 263 2.5 high flow
2018/03 (Q28) BO, DM, EP, SS 10:53 8.07 241 480 1.7 reservoir backed up to culvert; ice
Averages: 7.58 157 315 12.0
Standard Deviations: 0.50 50 99 7.5

Notes