This is a summary report of all data for Mamont 2 Pad site 05.

See Interpreting field and lab reports for more detailed information about the data in these tables.

Field Data Summary

Below is a field data summary report for this site, including averages and standard deviations of all measureable parameters. Collector initials are explained here.

Date Collector(s) Time pH TDS (ppm) Cond.(μS) Temp.(°C) Comments
2014/10 (Q14) BO, ET, TH 11:14 too low to sample
2014/12 (Q15) BO, TH 10:06 8.15 114 228 7.0 high sheet flow
2015/03 (Q16) BO, BF 10:30 7.12 123 252 5.8 medium flow
2015/06 (Q17) BO, GM, SW 11:39 7.45 120 243 16.0 medium flow
2015/09 (Q18) BO, NH, BF, CH too low to sample; not reaching reservoir
2015/12 (Q19) BO, PM 10:48 7.48 137 274 9.5 low-moderate flow
2016/03 (Q20) BFo, MH 12:54 7.47 144 285 8.1 very low flow
2016/06 (Q21) BO, JC, JL 11:13 8.01 161 322 22.3 trickle into reservoir
2016/09 (Q22) BO, CW, SJ, MH 14:50 7.35 203 407 25.0 disconnected pools, atv track
2016/12 (Q23) BO, NH, MH 13:07 7.27 113 226 1.6 moderate flow, ice
2017/03 (Q24) BO, SS, KL, MP 14:39 7.48 150 301 12.6 moderately high flow
2017/06 (Q25) BO, SJ, SS 14:25 7.18 111 218 19.2 medium flow, reservoir backed up to point
2017/09 (Q26) BO, EG 12:36 dry[1]
2017/12 (Q27) BO, SS, ZH 12:55 7.09 155 308 4.8 medium flow
2018/03 (Q28) BO, ZH, LB 12:08 7.74 111 222 6.0 medium flow
2018/06 (Q29) BO, ZH 13:48 7.74 159 320 20.4 medium steady flow
Averages: 7.50 139 277 12.2
Standard Deviations: 0.33 27 55 7.6

Notes

  1. ^ A site denoted as "dry" indicates an active sampling site that has little or no water present for field measurements.