Shaw Pad

From Beaver Run Project
Jump to: navigation, search

Quarterly Sampling Reports

Reports were collected from the Shaw Pad sampling sites during the following periods:

2011 2012 2013 2014 2015 2016 2017 2018
Mar. (Q08) Mar. (Q12) Mar. (Q16) Mar. (Q20) Mar. (Q24) Mar. (Q28)
Jun. (Q09) Jun. (Q13) Jun. (Q17) Jun. (Q21) Jun. (Q25) Jun. (Q29)
Sep. (Q10) Sep. (Q14) Sep. (Q18) Sep. (Q22) Sep. (Q26) Sep. (Q30)
Jan. '14 (Q11) Dec. (Q15) Dec. (Q19) Dec. (Q23) Dec. (Q27)

Individual Sampling Sites

Unless otherwise noted, Shaw Pad sampling began in March 2013. The following Shaw Pad sampling sites have quarterly sampling field data:

Notes

  1. ^ a b c This site was dropped from future sampling in December 2014.
  2. ^ a b Sites W-08 and W-09 were dropped from future sampling in September 2014.