Hutchinson Pad

From Beaver Run Project
Jump to: navigation, search

Quarterly Sampling Reports

Field data was collected from the Hutchinson Pad sampling sites during the following periods:

2011 2012 2013 2014 2015 2016 2017
Mar. Mar. Mar. Mar. Mar. Mar.
Jun. Jun. Jun. Jun. Jun. Jun. Jun.
Sep. Sep. Sep. Sep. Sep. Sep.
Dec. Dec. Dec. Dec. Dec. Dec.

Individual Sampling Sites

Unless otherwise noted, Hutchinson Pad sampling began in June 2011. The following individual Hutchinson Pad sampling sites have quarterly sampling field data:

Notes

  1. Site H-01 was dropped from future sampling in September 2015. It was noted as being redundant with Surface Bottle Site 19.
  2. Site H-07 was dropped from future sampling in December 2011.
  3. Site H-09 was dropped from future sampling in December 2011.
  4. Site H-10 was dropped from future sampling in September 2016.
  5. Site H-11 was dropped from future sampling in September 2016.
  6. 6.0 6.1 6.2 Sites H-12 through H-14 were added in September 2011.
  7. Site H-13 was dropped from future sampling in June 2013.



HomeField DataLab DataIUP CHEMIUP GEOGMunicipal Authority of Westmoreland Co.