Field Data Summary Report

Below is a field data summary report for this site, including the average value for each measured parameter and its standard deviation. Collector initials are explained here.

Date Collector Time pH TDS (ppm) Cond. (µS) Temp. (C°) Comments
2014/03 BO, ET, DT 10:45 7.45 95 184 6.1 new point, sampled 4/5/14
2014/06 TH, DT, JV, MP 16:53 6.52 119 240 15.4 none
2014/09 BO, ET, IT, BFo 11:44 8.06 120 239 16.2 very low flow
2014/12 BO, TH 12:57 7.45 171 342 8.6 moderate flow
2015/03 BO, BFo 13:40 7.25 164 328 4.9 low flow
2015/06 BO, GM, SW 14:28 7.01 88 174 17.1 medium flow
2015/09 BO, NH, SJ 12:03 7.86 130 262 19.6 sampled 25 ft. down from ribbon
2015/12 BO, PM 13:45 dry[1]
2016/03 BO, KL, JC 12:33 7.04 109 216 7.6 sampled approx. 4.5 m below flag
2016/06 BO, GO, MH 12:12 dry[1]
2016/09 BO, CW, MH, SJ 17:07 7.15 146 294 18.4 very low flow
Avg. values ± std. dev. 7.31 ± 0.44 127 ± 27 253 ± 56 12.7 ± 5.4

Notes

  1. 1.0 1.1 Site denoted as "dry" indicates an active sampling site that has little or no water present for field measurements.