Site S19

From Beaver Run Project
Jump to: navigation, search

This is a summary page of all field data for Mamont 1 pad site 19.

Field Data Summary Report

Below is a field data summary report for this site, including the average value for each measured parameter and its standard deviation. Collector initials are explained here.

Date Collector Time pH TDS (ppm) Cond. (µS) Temp. (C°) Comments
2014/03 TH, BO, ET, DT 12:52 6.72 48 101 3.0 new point
2014/06 TH, DT, JV, MP 16:19 7.16 79 157 20.1 moderate flow
2014/09 BO, ET, IT, BFo 9:00 8.04 113 226 14.6 very low flow, water pooled below culvert
2014/12 BO, TH 13:09 7.79 46 91 7.9 high flow
2015/03 BO, BFo 23:47 7.54 48 96 3.6 high flow
2015/06 BO, GM, SW 12:33 7.74 53 108 17.3 high flow out of culvert
2015/09 BO, NH, SJ 12:21 7.92 98 196 20.9 low flow
2015/12 BO, PM 13:54 7.18 64 128 10.0 moderate flow
2016/03 BO, KL, JC 10:29 6.64 67 134 5.4 moderate flow
2016/06 BO, GO, MH 10:12 7.64 94 183 19.3 moderate-low flow
2016/09 BO, CW, MH, SJ 15:25 7.54 117 235 21.8 low flow
Avg. values ± std. dev. 7.45 ± 0.44 75 ± 25 150 ± 50 13.1 ± 7.0

Notes



HomeField Data HomeMamont 1 Pad Main Page