Site S04

From Beaver Run Project
Jump to: navigation, search

This is a summary page of all field data for Mamont 1 pad site 04.

Field Data Summary Report

Below is a field data summary report for this site, including the average value for each measured parameter and its standard deviation. Collector initials are explained here.

Date Collector Time pH TDS (ppm) Cond. (µS) Temp. (C°) Comments
2012/03 RC, AH 12:05 8.63 139 277 11.0 low flow
2012/06 BF, AH 11:10 7.96 209 423 14.7 low flow
2012/09 BF, AH 11:30 7.83 224 450 18.6 very low flow
2012/12 BF, SD 11:32 8.05 116 231 9.0 murky water
2013/03 DH, AH 10:05 7.18 124 248 8.6 low flow
2013/06 DT, JV 9:52 8.07 222 446 14.1 very low flow
2013/09 ASo, DT, JV 17:00 7.89 199 397 16.0 low
2013/12 SD, BF 10:23 7.51 99 198 9.2 film on top of water
2014/03 TH, BO, ET, DT 10:35 7.85 142 284 7.1 slight inflow next to rockpile
2014/06 TH, DT, JV, MP 17:26 7.60 183 366 18.6 moderate flow
2014/09 BO, ET, IT, BFo 10:06 7.59 235 470 14.9 low flow (seep below road)
2014/12 BO, TH 11:52 7.78 107 214 8.0 high flow out of buried culvert, muddy
2015/03 BO, BFo 12:34 7.40 147 295 8.4 medium flow
2015/06 BO, GM, SW 13:23 7.51 131 268 13.8 barely flowing
2015/09 BO, NH, SJ 10:55 7.97 210 423 18.1 dry along road, very small seep, trickle into reservoir
2015/12 BO, PM 12:42 7.62 163 325 10.2 low seep
2016/03 BO, KL, JC 11:33 7.91 180 358 8.2 low flow
2016/06 BO, GO, MH 11:06 damp, too low to sample
2016/09 BO, CW, MH, SJ 16:18 7.61 232 463 21.9 sampled below point in exposed reservoir bed
Avg. values ± std. dev. 7.78 ± 0.31 170 ± 45 341 ± 90 12.8 ± 4.4

Notes



HomeField Data HomeMamont 1 Pad Main Page