Site M09

From Beaver Run Project
Jump to: navigation, search

This is a summary page of all field data for Mamont 2 pad site 09.

Field Data Summary Report

Below is a field data summary report for this site, including the average value for each measured parameter and its standard deviation. Collector initials are explained here.

Date Collector Time pH TDS (ppm) Cond. (µS) Temp. (C°) Comments
2015/03 BO, BFo 10:40 7.64 155 310 6.5 new point; medium flow
2015/06 BO, GM, SW 11:28 7.59 155 313 16.6 relatively high flow
2015/09 BO, NH, BFo, CH too low to sample
2015/12 BO,PM 11:12 7.44 155 311 10.2 low trickle
2016/03 BFo, MH 13:03 7.76 159 316 8.7 very low flow
2016/06 BO, JC, JL 10:59 7.67 171 343 21.2 trickle into reservoir; cloudy, made pool to sample
2016/09 BO, CW, SJ, MH 14:42 dry[1]
Avg. values ± std. dev. 7.62 ± 0.12 159 ± 7 319 ± 14 12.6 ± 6.1

Notes

  1. Site denoted as "dry" indicates an active sampling site that has little or no water present for field measurements.



HomeField Data HomeMamont 2 Pad Main Page