Site M01

From Beaver Run Project
Jump to: navigation, search

This is a summary page of all field data for Mamont 2 pad site 01.

Field Data Summary Report

Below is a field data summary report for this site, including the average value for each measured parameter and its standard deviation. Collector initials are explained here.

Date Collector Time pH TDS (ppm) Cond. (µS) Temp. (C°) Comments
2014/10 BO, ET, TH 9:50 7.54 186 373 14.2 iron precipitate, algae, trickle of flow into reservoir
2014/12 BO, TH 10:27 7.74 75 149 5.9 medium-high clear flow, joins w/M-02 trib. before reservoir
2015/03 BO, BFo 11:05 7.45 120 237 5.4 reservoir backed up above flag
2015/06 BO, GM, SW 10:57 6.92 123 240 15.7 moved upstream due to high reservoir
2015/09 BO, NH, BFo, CH 17:42 6.78 222 437 20.4 very low flow
2015/12 BO,PM 11:28 7.32 112 222 9.6 low flow
2016/03 BFo, MH 13:28 7.35 125 249 8.0 low flow
2016/06 BO, JC, JL 10:30 7.37 163 323 20.0 low flow
2016/09 BO, CW, SJ, MH 14:16 6.95 207 417 22.4 low flow
Avg. values ± std. dev. 7.27 ± 0.32 148 ± 49 294 ± 98 13.5 ± 6.6

Notes



HomeField Data HomeMamont 2 Pad Main Page