Shaw Pad field data was collected by Amanda Sommerer (ASo), Dana Turgeon (DT), and Jim Volosky (JV) on September 14, 2012. Weather was noted as cloudy, and that drilling was underway on the Shaw Pad.

Site ID Collector Time pH TDS (ppm) Cond. (uS) Temp. (C) Comments
W-01 ASo, DT, JV 10:45 6.44 137 274 15.8 very low flow
W-02 ASo, DT, JV 10:33 dry[1]
W-03 ASo, DT, JV 10:25 7.23 82 164 13.5 oil present, moderate flow
W-04 ASo, DT, JV 10:20 7.76 94 188 12.9 moderate flow
W-05 ASo, DT, JV 10:12 7.65 107 213 12.5 moderate flow
W-06 ASo, DT, JV 10:10 7.03 107 215 12.1 low flow
W-07 ASo, DT, JV 9:55 7.71 74 148 15.7 moderate flow
W-08 ASo, DT, JV 10:00 5.74 51 102 16.8 low flow
W-09 ASo, DT, JV 10:05 dry[1]
W-10 ASo, DT, JV 11:15 7.88 84 170 14.0 moderate flow
W-11 ASo, DT, JV 11:11 dry[1]
W-12 ASo, DT, JV 11:20 7.85 75 151 14.8 moderate flow
W-13 ASo, DT, JV 11:27 7.77 74 149 14.5 moderate flow
W-14 ASo, DT, JV 11:36 7.72 73 147 15.3 moderate flow
Average values 7.34 87 175 14.4