Mamont 2 Sep 2016 Field Data

From Beaver Run Project
Jump to: navigation, search

Mamont 2 Pad field data was collected by Brian Okey (BO), Chad Walker (CW), Shelagh Jackson (SJ), and Mike Heesh (MH) on September 9, 2016. Weather was noted as overcast with sprinkles.

Site ID Collector Time pH TDS (ppm) Cond. (uS) Temp. (C) Comments
M-01 BO, CW, SJ, MH 14:16 6.95 207 417 22.4 low flow
M-02 BO, CW, SJ, MH 14:19 7.28 160 319 22.3 moderate flow
M-03 BO, CW, SJ, MH 14:05 6.86 171 361 22.1 moderate flow
M-04 BO, CW, SJ, MH 14:55 too low to sample
M-05 BO, CW, SJ, MH 14:50 7.35 203 407 25.0 disconnected pools, atv track
M-06 BO, CW, SJ, MH 14:46 7.47 181 360 23.2 very low flow
M-07 BO, CW, SJ, MH 14:30 too low to sample
M-08 BO, CW, SJ, MH 14:53 too low to sample, not flowing to reservoir
M-09 BO, CW, SJ, MH 14:42 dry[1]
Average values 7.18 184 373 23.0

Notes

  1. Site denoted as "dry" indicates an active sampling site that has little or no water present for field measurements.



HomeField Data HomeMamont 2 Pad Main Page