Mamont 2 Sep 2015 Field Data

From Beaver Run Project
Jump to: navigation, search

Mamont 2 Pad field data was collected by Brian Okey (BO), Nathan Harpster (NH), Brian Fogle (BFo), and Chris Howell (CH) on September 18, 2015. Weather was noted as sunny and clear.

Site ID Collector Time pH TDS (ppm) Cond. (uS) Temp. (C) Comments
M-01 BO, NH, BFo, CH 17:42 6.78 222 437 20.4 very low flow
M-02 BO, NH, BFo, CH 17:37 7.70 149 302 20.0 low flow
M-03 BO, NH, BFo, CH 17:50 7.17 154 304 18.9 low flow
M-04 BO, NH, BFo, CH 17:04 7.63 183 265 21.8 very low flow
M-05 BO, NH, BFo, CH too low to sample; not reaching reservoir
M-06 BO, NH, BFo, CH 17:19 7.76 183 265 21.8 very low flow
M-07 BO, NH, BFo, CH completely dry
M-08 BO, NH, BFo, CH 17:12 7.16 187 383 17.0 seep trickling into reservoir
M-09 BO, NH, BFo, CH too low to sample
Average values 7.37 180 326 20.0

Notes



HomeField Data HomeMamont 2 Pad Main Page