Mamont 2 Pad field data was collected by Brian Okey (BO), Evan Tobin (ET), and Tony Harris (TH) on October 7, 2014.[1] Weather was noted as sunny.

Site ID Collector Time pH TDS (ppm) Cond. (uS) Temp. (C) Comments
M-01 BO, ET, TH 9:50 7.54 186 373 14.2 iron precipitate, algae, trickle of flow into reservoir
M-02 BO, ET, TH 9:54 7.90 157 315 14.4 moderately low flow into reservoir
M-03 BO, ET, TH 10:08 7.91 149 298 14.7 moderate flow out of culvert, fish observed upstream from here
M-04 BO, ET, TH 11:02 8.09 172 347 14.5 trickle flow into reservoir, almost too low to sample
M-05 BO, ET, TH 11:14 too low to sample
M-06 BO, ET, TH 11:18 8.10 176 352 16.6 trickle
M-07 BO, ET, TH 11:25 too low to sample, beaver den and chewed trees
Average values 7.91 168 337 14.9