Mamont 1 Pad

From Beaver Run Project
Jump to: navigation, search

Quarterly Sampling Reports

Field data was collected from the Mamont-1 Pad sampling sites during the following periods:

2011 2012 2013 2014 2015 2016
Mar. Mar. Mar. Mar. Mar.
Jun. Jun. Jun. Jun. Jun.
Sep. Sep. Sep. Sep. Sep.
Dec. Dec. Dec. Dec.

Individual Sampling Sites

Unless otherwise noted, Mamont-1 Pad sampling began in March 2012. The following Mamont-1 pad sampling sites[1] have quarterly sampling field data:

Notes

  1. Mamont-1 Pad sites are designated with "S" instead of "M" because this site was originally name the Stewart Pad.
  2. 2.0 2.1 This site was dropped from further sampling in December 2014.
  3. 3.0 3.1 This site was dropped from future sampling in September 2016.
  4. Site S-16 was dropped from future sampling in June 2015.
  5. Site S-18 was added in March 2014 and dropped from future sampling in December 2014.
  6. Site S-19 was added in March 2014.
  7. Site S-20 was added in April 2014.
  8. Site S-21 was added in June 2015 and dropped from future sampling in September 2016.



HomeField DataLab DataIUP CHEMIUP GEOGMunicipal Authority of Westmoreland Co.