Mamont 1 Dec 2016 Field Data

From Beaver Run Project
Jump to: navigation, search

Mamont 1 Pad field data was collected by Brian Okey (BO), Mike Heesh (MH), and Guadalupe Ortiz-Cortez (GO) on December 18, 2016. Weather was noted as overcast with drizzle and flurries.

Site Collectors Time pH TDS (ppm) Cond. (μS) Temp. (°C) Comments
S-02 BO, MH, GO 10:40 6.30 80 160 5.2 extremely high flow
S-03 BO, MH, GO 10:47 6.22 81 165 11.0 very high flow
S-04 BO, MH, GO 10:49 6.24 69 138 8.8 very high flow
S-07 BO, MH, GO 11:29 6.28 46 95 6.7 extremely high flow from both upstream branches
S-08 BO, MH, GO 10:53 6.40 43 86 6.0 extremely high flow
S-09 BO, MH, GO 10:51 6.35 43 86 5.9 extremely high flow
S-10 BO, MH, GO 11:00 6.39 47 94 6.7 high flow, dropped site 21 trickling
S-11 BO, MH, GO 11:07 6.15 48 97 11.1 high flow
S-13 BO, MH, GO 11:56 6.33 43 87 5.5 very high flow
S-14 BO, MH, GO 11:54 6.36 40 81 5.7 extremely high flow
S-15 BO, MH, GO 11:49 6.30 42 85 5.9 extremely high flow, steady flow from inflow channel
S-17 BO, MH, GO 11:46 6.33 44 88 6.1 extremely high flow
S-19 BO, MH, GO 12:07 6.41 34 68 5.6 very high flow
S-20 BO, MH, GO 11:40 6.31 35 69 6.1 high flow out of culvert
Average values 6.31 50 100 6.9