Mamont 1 Pad field data was collected by Brian Okey (BO) and Tony Harris (TH) on December 16, 2014. Weather was noted as overcast with recent rain.

Site ID Collector Time pH TDS (ppm) Cond. (uS) Temp. (C) Comments
S-01 dropped[1]
S-02 BO, TH 11:45 7.75 85 169 6.5 very high flow out of culvert, muddy
S-03 BO, TH 11:54 trickle below leaves, too little to sample
S-04 BO, TH 11:52 7.78 107 214 8.0 high flow out of buried culvert, muddy
S-05 BO, TH 12:45 7.26 74 151 8.8 low and clear
S-06 BO, TH 12:40 7.50 36 72 7.0 high flow, cloudy and foamy
S-07 BO, TH 12:48 7.66 45 90 7.5 high flow, cloudy
S-08 BO, TH 11:57 7.82 58 116 7.0 high flow
S-09 BO, TH 12:04 7.44 55 110 6.6 high clear flow
S-10 BO, TH 12:12 7.45 112 223 10.0 low flow
S-11 BO, TH 12:19 7.68 129 260 11.2 sampled in spring house, doesn't flow to reservoir
S-12 dropped[1]
S-13 BO, TH 11:22 7.66 108 216 6.4 high flow, muddy
S-14 BO, TH 11:27 7.75 56 109 7.2 high flow, muddy
S-15 BO, TH 11:17 7.78 56 112 7.1 high flow, muddy
S-16 BO, TH 11:14 7.74 57 114 6.6 high flow, muddy
S-17 BO, TH 11:02 7.74 58 114 7.0 high flow
S-18 dropped[1]
S-19 BO, TH 13:09 7.79 46 91 7.9 high flow
S-20 BO, TH 12:57 7.45 171 342 8.6 moderate flow
Average values 7.64 78 156 7.7

Notes

  1. 1.0 1.1 1.2 A site denoted by "dropped" means that this sampling point will no longer be visited for field or lab data collection. Reasons for dropping a sampling point may include: redundancy with other sites; site is no longer accessible; land use changes may have removed the site (e.g., new road, culvert, etc.). This site will not appear in future data reports unless reactivated.