Hutchinson Pad field data was collected by Brian Okey (BO) and Brian Fogle (BFo) on March 21, 2015. Weather was noted as partly sunny.

Site ID Collector Time pH TDS (ppm) Cond. (uS) Temp. (C) Comments
H-01 BO, BFo 15:10 7.33 200 400 7.7 high flow out of culvert
H-02 BO, BFo 14:38 7.37 170 340 7.6 high flow
H-03 BO, BFo 14:49 7.57 72 145 7.8 high flow
H-04 BO, BFo 14:53 7.50 68 137 7.1 high flow
H-05 BO, BFo 15:02 7.17 134 268 8.1 low flow
H-06 BO, BFo 14:56 7.47 60 121 6.4 high flow
H-08 BO, BFo 14:05 7.47 59 120 8.8 high flow
H-10 BO, BFo 14:21 7.56 29 60 7.4 corner of reclaimed flowback pond area; seep runs through culvert below
H-11 BO, BFo 14:25 8.30 71 144 7.4 medium-high flow
H-12 BO, BFo 14:45 7.48 167 333 7.8 reservoir backed up to sample point
H-14 BO, BFo 13:52 7.43 51 103 6.8 high flow
Average values 7.51 98 197 7.5