Hutchinson Pad field data was collected by Alex Hall (AH) and Jesse Kunkle (JK) on March 8, 2013.

Site ID Collector Time pH TDS (ppm) Cond. (uS) Temp. (C) Comments
H-01 AH, JK 15:30 8.00 168 333 5.1 high flow out of culvert
H-02 AH, JK 15:35 7.93 171 342 5.0 high flow
H-03 AH, JK 15:45 8.02 72 143 4.2 low flow
H-04 AH, JK 15:50 7.94 74 147 4.5 low flow
H-05 AH, JK dry[1]
H-06 AH, JK 15:55 7.80 63 127 4.9 low flow
H-08 AH, JK 16:30 7.48 62 126 6.1 low flow
H-10 AH, JK 16:10 7.73 34 73 3.6 pool out of drainage pipe
H-11 AH, JK 16:15 7.53 67 133 4.8 low flow
H-12 AH, JK 15:37 7.88 172 361 5.0 high flow
H-13 AH, JK water was backed up from reservoir; could not sample
H-14 AH, JK 16:35 7.55 56 113 4.5 moderate flow
Average values 7.79 94 190 4.8

Notes

  1. Site denoted as "dry" indicates an active sampling site that has little or no water present for field measurements.