Hutchinson Jun 2015 Field Data

From Beaver Run Project
Jump to: navigation, search

Hutchinson Pad field data was collected by Brain Okey (BO), Gregg Mirth (GM), and Paul Mehalik (PM) on June 28, 2015. Weather was noted as overcast with showers.

Site ID Collector Time pH TDS (ppm) Cond. (uS) Temp. (C) Comments
H-01 BO, GM, PM 14:31 7.15 111 221 16.9 high flow out of culvert
H-02 BO, GM, PM 13:47 7.41 91 181 16.3 high flow
H-03 BO, GM, PM 13:34 7.82 50 99 15.9 high flow
H-04 BO, GM, PM 13:36 7.71 47 94 15.4 high flow, spread beyond bank
H-05 BO, GM, PM 13:42 7.42 95 188 12.4 moderate flow
H-06 BO, GM, PM 13:38 7.60 50 99 14.7 high flow
H-08 BO, GM, PM 14:10 7.44 47 93 12.4 high flow
H-10 BO, GM, PM 14:20 7.32 38 77 20.3 high trickle
H-11 BO, GM, PM 14:24 7.28 52 104 13.1 relatively high flow
H-12 BO, GM, PM 13:29 7.58 158 314 23.0 stagnant reservoir backed above point
H-14 BO, GM, PM 14:03 7.53 44 87 13.8 sampled above, reservoir backed up; high flow
Average values 7.48 71 142 15.8

Notes