Hutchinson Dec 2013 Field Data

From Beaver Run Project
Jump to: navigation, search

Hutchinson Pad field data was collected by Jim Volosky (JV) and Mike Perry (MP) on December 21, 2013. Weather was noted as rainy.

Site ID Collector Time pH TDS (ppm) Cond. (uS) Temp. (C) Comments
H-01 JV, MP 11:00 7.00 188 376 7.3 fast/heavy flow
H-02 JV, MP 10:45 6.28 403 793 6.6 none
H-03 JV, MP 9:45 7.41 72 140 7.7 none
H-04 JV, MP 10:15 7.45 78 157 7.2 none
H-05 JV, MP 10:20 too low to test
H-06 JV, MP 10:30 7.12 63 120 7.1 none
H-08 JV, MP 11:25 7.07 59 119 9.0 heavy flow
H-10 JV, MP 11:15 7.50 44 87 7.7 moderate flow
H-11 JV, MP 11:05 7.40 42 84 7.2 heavy flow
H-12 JV, MP 9:30 8.24 144 280 7.6 none
H-14 JV, MP 11:35 7.51 52 103 8.6 heavy flow
Average values 7.30 114 226 7.6

Notes



HomeField Data HomeHutchinson Pad Main Page