Aikens Mar 2012 Field Data

From Beaver Run Project
Jump to: navigation, search

Aikens Pad field data was collected by Robert Cerrato (RC) and Brian Flick (BF) on March 1, 2012. Weather was noted as overcast.

Site ID Collector Time pH TDS (ppm) Cond. (µS) Temp. (C°) Comments
A-01 RC, BF 13:42 7.50 88 174 6.3 moderate flow
A-02 RC, BF 13:43 7.87 105 210 6.4 moderate flow
A-03 RC, BF 13:46 8.11 107 214 6.1 sediment evident, coffee-colored
A-04 RC, BF 13:50 8.08 64 127 6.1 steady flow at confluence, clear water
A-05 RC, BF 13:52 8.09 61 122 6.3 steady flow
A-06 RC, BF 13:54 8.01 60 123 6.4 a little murky, steady flow
A-07 RC, BF 13:56 8.02 61 120 6.5 shallow, rocky
A-08 RC, BF 13:57 8.12 61 121 6.5 steady, convergence point w/small stream
A-09 RC, BF 13:59 7.98 48 99 6.6 convergence w/small stream
A-10 RC, BF 14:04 7.96 59 115 6.4 convergence w/steady stream; shallow, slow moving
A-11 RC, BF 14:07 7.87 56 113 6.1 last point before resevoir, deeper, a little murky
A-12 RC, BF 14:10 7.17 54 112 9.3 runoff,very little water
A-13 RC, BF dry[1]
A-14 RC, BF 14:20 7.72 129 257 5.4 reservior area
A-15 RC, BF 14:26 8.34 88 174 5.4 very low flow drainage site
A-16 RC, BF 14:32 8.35 59 117 6.4 moderate flow after weir
A-17 RC, BF 14:35 8.02 54 109 6.2 convergence point, moderate flow, shallow, coffee color
A-18 RC, BF 14:41 7.33 90 182 8.5 low flow, convergence point
A-19 RC, BF 14:46 7.75 56 105 6.9 convergence from two culverts
Average values 7.90 72 144 6.5

Notes

  1. Site denoted as "dry" indicates an active sampling site that has little or no water present for field measurements.



HomeField Data HomeAikens Pad Main Page